3 Mount the transmitter
3.1 Overview
Mount the transmitter at a high point in the conduit run to prevent moisture
from draining into the transmitter housing.
3.2 Typical European and Asia Pacific installation
Head mount transmitter with DIN plate style sensor
Procedure
1. Attach the thermowell to the pipe or process container wall. Install
and tighten thermowells before applying process pressure.
2. Assemble the transmitter to the sensor.
a) Push the transmitter mounting screws through the sensor
mounting plate.
3. Wire the sensor to the transmitter.
4. Insert the transmitter-sensor assembly into the connection head.
a) Thread the transmitter mounting screw into the connection
head mounting holes.
b) Assemble the extension to the connection head.
c) Insert the assembly into the thermowell.
5. Slip the shielded cable though the cable gland.
6. Attach a cable gland into the shielded cable.
7. Insert the shielded cable leads into the connection head through the
cable entry. Connect and tighten the cable gland.
8. Connect the shielded power cable leads to the transmitter power
terminals. Avoid contact with sensor leads and sensor connections.
9. Install and tighten the connection head cover. Enclosure covers must
be fully engaged to meet explosion-proof requirements.
February 2021 Quick Start Guide
Quick Start Guide 7