EasyManua.ls Logo

EMERYMARK EMP 200 - Page 54

Default Icon
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operation Manual EMP
www.emerymark.com
54
With the rst mold inside the vat, start lling the next with product and insert it into the vat.
Repeat the process until you ll the vat completely with molds.
YOU SHOULD NOT PLACE ALL MOLDS AT THE SAME TIME AS THE TEMPERATURE OF THE
MACHINE WOULD NOT BE PROPER AND WOULD TAKE A LONGER TIME TO FREEZE THE
PRODUCT.
5. When molds are ready, please take out one
at a time.
6. Use mold remover, put the mold inside
(3 seconds).
7. Pull out the lid of the mold.