Installation Micropilot FMR51, FMR52 PROFIBUS PA
20 Endress+Hauser
6.3 Mounting cladded flanges
• Use flange screws according to the number of flange holes.
• Tighten the screws with the required torque (see table).
• Retighten the screws after 24 hours or after the first temperature cycle.
• Depending on process pressure and process temperature check and retighten the
screws at regular intervals.
Flange size Number of screws Recommended torque [Nm]
minimum maximum
EN
DN50/PN16 4 45 65
DN80/PN16 8 40 55
DN100/PN16 8 40 60
DN150/PN16 8 75 115
ASME
2"/150lbs 4 40 55
3"/150lbs 4 65 95
4"/150lbs 8 45 70
6"/150lbs 8 85 125
JIS
10K 50A 4 40 60
10K 80A 8 25 35
10K 100A 8 35 55
10K 100A 8 75 115
6.4 Installation in vessel (free space)
6.4.1 Horn antenna (FMR51)
Alignment
• Align the antenna vertically to the product surface.
The maximum range may be reduced if the horn antenna is not vertically aligned.
• A marking at the flange (somewhere between the flange holes) or the boss enables
alignment of the antenna. This marking must be aligned towards the tank wall as well as
possible.