EasyManua.ls Logo

Endress+Hauser Micropilot FMR53 - Page 22

Endress+Hauser Micropilot FMR53
64 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation Micropilot FMR53, FMR54 HART
22 Endress+Hauser
6.3 Mounting cladded flanges
For cladded flanges of FMR53, observe the following:
Use flange screws according to the number of flange holes.
Tighten the screws with the required torque (see table).
Retighten the screws after 24 hours or after the first temperature cycle.
Depending on process pressure and process temperature check and retighten the
screws at regular intervals.
Usually, the PTFE flange cladding also serves as a seal between the nozzle and the device
flange.
Flange size Number of screws Recommended torque [Nm]
minimum maximum
EN
DN50/PN16 4 45 65
DN80/PN16 8 40 55
DN100/PN16 8 40 60
DN150/PN16 8 75 115
ASME
2"/150lbs 4 40 55
3"/150lbs 4 65 95
4"/150lbs 8 45 70
6"/150lbs 8 85 125
JIS
10K 50A 4 40 60
10K 80A 8 25 35
10K 100A 8 35 55
10K 100A 8 75 115
6.4 Installation in vessel (free space)
6.4.1 Rod antenna (FMR53)
Alignment
Align the antenna vertically to the product surface.
A marking at the flange (somwhere between the flange holes) or the boss enables
alignment of the antenna. This marking must be aligned towards the tank wall as well as
possible.

Other manuals for Endress+Hauser Micropilot FMR53

Related product manuals