EasyManua.ls Logo

Enerzone Solution 2.3 - Page 55

Default Icon
59 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Solution 2.3 Installation and Operation Manual 55
Note that secondary air tubes (B) can be replaced without removing the baffle board (A).
Important Notes:
The air tubes are identified for placement as follows:
Model Type of tube
Solution 2.3
Front ► 30 holes of 0.147"
Middle front ► 30 holes of 0.136’’
Middle rear ► 20 holes of 0.128’’
Rear ► 15 holes of 0.128’’

Table of Contents

Other manuals for Enerzone Solution 2.3