Page 16 of 38
102808_CAPAC_MANUAL_MODEL_90W12D_SYSTEM.doc
the brass hub. Then place reference electrode in a warm (at least 70
° F)
place to keep bead soft until installed.
3. Insert the warm reference electrode hub through the hole in the hull and
press it in place.
4. On the inside of the hull, wrap three turns of butyl bead around the gland
and against the hull and place items 2, 3, and 4 over the treaded stem of
the reference electrode. Tighten item 4 but do not apply more than 30 ft.-
lbs. of torque.
5. Strip ends of #14 gauge single conductor and 9 inch reference electrode
cables approximately 5/16” and insert the stripped end of 9 inch reference
electrode through items 5, 6, and 8 of clear plastic encased splice.
NOTE – either end of encased splice can be used since both ends are
identical.
6. Insert the stripped end of #14 gauge, single conductor wire going to the
CAPAC Controller through items 9 and 10 of clear plastic encased splice.
7. Butt splice anode wire to #14 gauge single conductor wire going to the
CAPAC Controller using butt connector (item 7). Crimp and soft solder
connector as shown in Figure 3.1. Thread the ribbed nuts (items 5 and
10) onto the threaded tube (item 8) and tighten.
Controller Installation
The controller is wired as shown in Figure 3.6. Any dry location in the
bilge or the cabin will serve as a good mounting location. The unit is mounted
with #10 screws or bolts through the four holes provided. To prevent damage to
the Controller or Monitor remove the controller fuse until all wiring is complete.
CAPAC
®
Monitor Installation
The CAPAC
®
Monitor is designed to be connected to the “Monitor(+)”
terminal of the 90W12D controller. Strip and connect the cables according to
Figure 3.6.
The connections to the CAPAC
®
Monitor are as follows:
Plus (+) terminal – to 90W12D controller “Monitor (+)” terminals.
Minus (-) terminal – to 90W12D controller “Monitor (-)” terminals.