EasyManua.ls Logo

Extra 200 - Page 49

Extra 200
330 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
EXT
RA - FLUGZEUGBAU GmbH
SERVICE MANUAL EXTRA 200
CHAPTER 05
PAGE 11
PAGE DATE: 1. July 1996
Inspector:
Mechanic:
Inspections
Date:
Serial No.:
as specified
each 100 hours
each 50 hours
SCHEDULED MAINTENANCE CHECKS
Maintenance Checks Schedule
O O 17 Check the optional electronic g-meter for the maximum g-
loading. If extreme value exceeds ±10 G, contact EXTRA-
Flugzeugbau GmbH. Correct date and time of the g-meter
(refer to DSA-12 Manual).
O O 18 Ignition OFF, main switch OFF, remove ignition key.
O O 19 Check if ignition key is removable in OFF-position only, and
if key functions in accordance with the requirements of the
Teledyne Continental Service Bulletin No. 636.
Propeller
(refer to latest edition of MT-Propeller Operation and Instal-
lation Manual E-124 and Service Bulletins)
Ground magneto primary circuit before
working on propeller
O 1 Remove spinner and check for cracks.
O O 2 Check blade shake, max. 3 mm or 1/8 inch.
O O 3 Check blade angle play, max. 2°.
O 4 Inspect outside condition of the hub and parts for cracks,
corrosion, deterioration.
O 5 Inspect check nut for high pitch stop for tightness.
O O 6 Check all safety means to be intact.
O O 7 Check flange bolts or stopnuts for tightness.
O 8 Check front and rear spinner plate for cracks and fixing.
O O 9 Inspect blade root and hub for oil- and grease leaks.
O 10 Check position and condition of counterweights.
O O 11 Check blades for cracks in the fibreglass-cover and blade
erosion sheet. No cracks allowed. Refer to MT-Propeller SB
No. 8
O
1
12 Overhaul propeller or perform a tear-down inspection.
D A N G E R
1 refer to MT-Propeller Service Bulletin No. 1

Other manuals for Extra 200

Related product manuals