EXT
RA - FLUGZEUGBAU GmbH
SERVICE MANUAL EXTRA 200
CHAPTER 05
PAGE 33
PAGE DATE: 1. July 1996
Inspector:
Mechanic:
Inspections
Date:
Serial No.:
Hard Landing
UNSCHEDULED MAINTENANCE CHECKS
Landing gear
O 1 Examine landing gear mounting clamps for defects (e.g. cracks and
deformed areas)
O 2 Check clamp bolts of the landing gear for cracks, replace when
necessary
O 3 Examine wheel track and wheel base and check if measurement
correspond to the value given in Chapter 06-10-01.
O 4 Remove and check the fairings for delamination, deformations and
cracks
O 5 Check the landing gear spring for delamination, deformations and
cracks, especially in the area of the axle attachment
O 6 Check fuselage structure in the area of landing gear attachment for
deformation and cracks
O 7 Check tires for cuts in the side wall
O 8 Check wheel halves and brake discs for impacts, cracks and distortion
according to CLEVELAND instruction.
O 9 Check tail wheel for deformation and cracks, especially in the area of
the axle attachment
O 10 Check fuselage structure in the area of the tail wheel for deformation
and cracks
Control surfaces
O 1 Check control surfaces for proper operation
O 2 Check control surface hinges for cracks, security and free movement
O 3 Check the balance weights of the elevator for security of attachment
O 4 Check the spades for security of attachment
Engine
O 1 Check engine mount