EasyManua.ls Logo

Extreme Networks AP-7522 - Wall Mount Procedure - Existing AP Replacement; Ceiling T-Bar Mount Installation

Extreme Networks AP-7522
55 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation Guide 15
For Power Injector installations:
a. Connect a RJ-45 CAT5e (or CAT6) Ethernet cable between the Power Injector
Data & Power Out connector and the Access Point’s GE1/POE port.
b. Connect a RJ-45 CAT5e (or CAT6) Ethernet cable between the network data
supply (host) and the Power Injector Data In connector.
c. Ensure the cable length from the Ethernet source (host) to the Power Injector and
Access Point does not exceed 100 meters (333 ft). The Power Injector has no
On/Off power switch. The Power Injector receives power as soon as AC power is
applied.
For standard power adapter (non Power Injector) and line cord installations:
a. Connect a RJ-45 Ethernet cable between the network data supply (host) and the
Access Point’s GE1/POE port.
b. Verify the power adapter is correctly rated according to the country of operation.
c. Connect the power supply line cord to the power adapter.
d. Attach the power adapter cable into the power connector on the Access Point.
e. Attach the power supply line cord to a power supply.
6. Verify the Access Point is receiving power by observing the LEDs are lit or flashing. For
more information on AP-7522 LED behavior, see LED Indicators on page 19.
7. The Access Point is ready to configure.
2.5.2 Wall Mount Procedure - Existing Access Point Replacement
An existing AP-7131 or AP-7131N Series Access Point installed on a wall can be replaced by
an AP-7522. Simply remove the existing AP-7131 or AP-7131N and install the new provided
mounting bracket for AP-7522 directly to the wall. The cabling procedure for such a
replacement is as described in the previous section.
2.6 Suspended Ceiling T-Bar Mount Installation
Ceiling mount requires holding the AP-7522 up against a T-bar of a suspended ceiling grid and
twisting the unit on to the T-bar. If deploying the AP-7522 on a sculpted ceiling T-Bar, the
Access Point mounting kit (Part No. KT-135628-01) can optionally be used as well.
CAUTION If not using an AP-PSBIAS-2P3-ATR power injector,
ensure only the AP-7522’s designated power supply
(PWRS-14000-54R) is used to supply power to the
Access Point. Using an incorrectly rated power supply
could damage the Access Point and void the product
warranty. Do not actually connect to the power source
until the cabling portion of the installation is complete.
!

Related product manuals