EN
8
8
INSTALLATION
This hood is designed to be mounted on the ceiling/on a shelf, above a free-standing Hob (min. 650
mm), in:
! Recirculation version: Internal recirculation.
Sequence of operations - Installation
• Preparing for installation
• Drilling the Ceiling/Shelf and Fixing the support plate
• Connections
• Fitting the hood body
• Functional Check
• Disposal of Packaging
Opening Plate and preparing for assembly
! Unfasten the screws joining the plate to its cover.
! Take the plate and position it in the correct direction, as shown in the figure.