USER MANUAL FOR FT TOWERS 19
Figure 51
Figure 52
When the section reaches its end of path, lock
with the safety system and unlock the next safety
system to raise the next mast. Perform the same
operation until you reach the required height.
Figure 53
All security systems must be in locked position.
Slacken the cable of the winch so that the
system can stabilize correctly.
Figure 54
Raise the load with the hoist to the required
height.