EasyManua.ls Logo

Ferris IS3100Z Series - Tractor Assembly Procedures

Ferris IS3100Z Series
24 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
IS3100Z Series - 4 Wheel IS - 61” & 72” Mower Deck
4
Tractor
Assembly
Assemble the Motion Control Handles
1. Remove the handles and mounting hardware from
the handle bar box.
2. Install the ground speed control handles (A, Figure 4)
onto the control lever base using the 5/16-18 x 3/4”
bolts (B), 5/16” lock washers and 5/16” flat washers
(C). Prior to tightening the bolts, align the handles
with each other.
NOTE: There is a LEFT-HAND and a RIGHT-HAND
control handle. When assembled to the base, the
handle base should be pointing towards the rear of the
machine as shown in Figure 4.
Assemble the Seat
1. Unpack the seat.
2. Install the seat onto the seat mount plate and secure
with the 5/16-18 nylon lock nuts.
Figure 4. Control Handle Installation (Left side
shown)
A. Control Handle
B. 5/16-18 x 3/4” Bolt(s)
C. 5/16” Lock Washer(s) & 5/16” Flat Washer(s)
A
B
C

Related product manuals