EasyManua.ls Logo

Ferroli DOMIcompact F 30 D User Manual

Ferroli DOMIcompact F 30 D
40 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
wall-mounted gas fired,
combination boiler
DOMIcompact F 30 D
INSTRUCTIONS FOR USE, INSTALLATION AND MAINTENANCE
FOR THE UNITED KINGDOM & EIRE
cod. 3540B62/3 - 05/2006

GC N° 47-267-40
Question and Answer IconNeed help?

Do you have a question about the Ferroli DOMIcompact F 30 D and is the answer not in the manual?

Ferroli DOMIcompact F 30 D Specifications

General IconGeneral
BrandFerroli
ModelDOMIcompact F 30 D
CategoryBoiler
LanguageEnglish

Summary

OPERATING INSTRUCTIONS

1.1 Introduction

Introduction to the DOMIcompact F 30 D boiler, highlighting its advanced features, reliability, and quality construction.

1.2 Control Panel and Operation Status

Overview of the control panel, its keys, display, and how to interpret operational status indicators.

1.3 Turning the Boiler On and Off

Step-by-step guide for igniting and shutting down the boiler, including safety precautions and frost protection.

1.4 Temperature and Mode Adjustments

Covers summer/winter switchover, CH temperature, hot water temperature, ECO/COMFORT selection, and TEST MODE.

1.5 Boiler Maintenance and Cleaning

Recommendation for annual maintenance and instructions for cleaning the boiler casing and aesthetic parts.

1.6 Identifying and Resolving Faults

Guide to the boiler's self-diagnosis system, fault codes, and troubleshooting common issues.

INSTALLATION PROCEDURES

2.1 General Installation Guidelines

Ensures the device is used for its intended purpose and installation is by qualified personnel.

2.2 Boiler Location and Mounting

Specifies requirements for the installation room, wall mounting, and minimum clearances around the unit.

Make-Up Water System Connection

Details on providing for replacing water lost from the sealed system, referencing BS6798.

2.3 Boiler Water and Pipe Connections

Guidance on establishing heating capacity, plumbing system design, and accessory requirements.

Water Treatment Recommendations

Recommends specific water treatment products and system cleansing according to B.S. 7593.

2.4 Gas System Connection

Instructions for consulting gas suppliers, gas meter connection, and pipe fitting standards (BS6891).

2.5 Electrical Connections

Requirements for connecting to a single-phase, 230 Volt-50 Hz electrical supply and earthing system.

Optional Time Clock Installation

Step-by-step guide for fitting and connecting the optional 24-hour time clock to the boiler.

Accessing Terminal Blocks for Controls

Procedure to access the terminal block for connecting room thermostats or remote timer controls.

2.6 Flue System Installation

Details on type C units, airtight chambers, forced draught, and flue system component requirements.

Concentric Flue Connection Methods

Diagrams and instructions for connecting the unit to a concentric flue, horizontal or vertical.

Two-Pipe System Flue Connection

Instructions for connecting the unit to separate air/flue ducts for vertical or horizontal outlets.

Flue Terminal Positioning Requirements

Minimum dimensions for flue terminal positions to ensure safety and compliance with regulations.

Collective Flue System Connection

Design criteria for connecting to collective flues or single flues with natural draught per UNI 10641.

SERVICE AND MAINTENANCE

3.1 Adjustments, Conversions, and Test Mode

Guidance for qualified engineers on adjustments, gas conversion, burner pressure, and TEST mode operation.

Adjusting Heating and Ignition Power

Instructions on how to adjust the boiler's heating power and ignition power using TEST mode.

3.2 Initial Start-up and Commissioning

Essential checks before lighting the boiler and the procedure for initial lighting and operation.

Routine Operational Checks

Checks to perform during boiler operation, including gas soundness, water circulation, and ignition.

3.3 Maintenance and Seasonal Inspections

Details on maintenance by qualified personnel, seasonal inspections, and cleaning the boiler and burner.

Combustion Analysis Procedure

Procedure for taking gas and air samples for combustion analysis using the boiler's sampling points.

3.4 Troubleshooting Faults

Guide to diagnosing and resolving boiler faults using the self-diagnosis system and fault codes.

TECHNICAL CHARACTERISTICS AND DATA

4.1 Dimensions and Connection Points

Diagrams showing the boiler's physical dimensions and connection points for water, gas, and heating systems.

4.2 General View and Component Identification

A detailed view of the boiler with numbered components and a key for identification.

4.3 Hydraulic Diagram and Flow Paths

Schematic illustrating the internal water flow paths, components, and their connections.

4.4 Technical Data Specifications

Comprehensive table of technical specifications including powers, gas supply, heating, hot water, dimensions, and electrical data.

4.5 Performance and System Diagrams

Graphs showing burner pressure vs. boiler output and circulator losses of head.

4.6 Optional Time Clock Operation Details

Instructions for setting the time, programmes, and override functions of the optional 24-hour time clock.

4.7 Electrical Wiring Diagram

Detailed diagram showing electrical connections for various components and external controls.

Related product manuals