7 Mounting
7.1 Assembly
7.1.1 Linking of Valves
Up to 5 valves can be linked. The connecting kit VAME-P18-K-P5 is required for linking
èwww.festo.com/catalogue.
The connecting kit consists of 2 square nuts, 2 socket head screws and an O-ring.
1. Remove the plug screw and sealing material from the duct (1).
2. Insert the O-ring into the duct (1) between 2 valves è Fig.2.
Fig. 2 Insert O-ring
3. Connect the valves on the underside using socket head screws and square nuts. Tightening
torque: 1.2±0.2Nm è Fig.3
Fig. 3 Fitting for valve underside
Mounting
6 Festo — VPPI-...-D — 2019-12