EasyManua.ls Logo

Fetco CBS-2111 - Description & Features

Fetco CBS-2111
22 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Go to fetco.com for the latest versions of all information Page 3 User Guide & Operator instructions P171 NEW MARCH 2018
Description & Features
Description
-The CBS-2111 Coffee brewer with hot water bypass has user interactive touch screen display & control.
-Batch size is preset to brew 6.0 liter/1.6 gallon with a ratio of 4 liter brew to 2 liter hot water bypass.
All eight batch sizes, brew to bypass ratios, and temperatures are programmable to any customer preference
Features
-Low profile
-High-Volume Coffee brewer with hot water bypass feature
-Eight programmable recipes: Factory set with two user adjustable permanent recipes
-Six additional recipes may be optionally programmed or hidden
-Individual recipe temperatures can be set by use
-Hot water tank recovers rapidly and may be quickly lowered for specialty recipe temperature with “PURGE” function
The following can be accessed and programmed:
-BATCH SIZE & BYPASS [Hot Water Bypass] Infinitely variable-factory set at 4.0 liter brew/2.00 liter hot water bypass.
-BREW TEMPERAURE
-PURGE TO LOWER BREW TEMPERATURE: OPTIONAL SELECTION! Operator may use PURGE touch key.
Holding the key for the maximum five seconds releases 150 cc/4 fl.oz hot tank water to reduce brew temperature.
-PULSE BREW: Using information entered, the software calculates how much water to dispense for brew and for hot
water “BYPASS”. The total dispense time is divided into on/off cycles that dispenses the correct amount of water and
pauses to drain the brew basket. Pulse brew can be set by the operator. Factory set is four on/off fill/drain cycles.
Controls automatically cycle valves to dispense the correct amount of water set in the recipe.
-RECIPES are all adjustable. Recipes 1&5 are permanent; recipes 2, 3, 4, 6, 7, 8 can be programmed or hidden.
See pages 6-13 for programming, adjustments and calibration.
ICON Definition Table
ICON
Definition
ICON
Definition
ICON
Definition
Ready to brew
Brew time
Brew valve cyle isopen,
and is cascading water.
Brewer not ready
for this recipe
(may be overridden)
[[¯]]
Batch Size
Brew valve paused.
Pulse brew-drain
Hot water tank -
filled
Temperature icon
Waiting
Hot water bypass ready
to start- paused (delay)
Hot water tank
filling/refilling
When blinking:
Hot water tank
temperature over
setting.
Purge to reduce
water temperature
Drip-out
/
Heating/
At Temperature
Hot Water bypass “ON”
or
Toggle from menu
screen 1-4 to 5-8
Press purge key
to reduce water
temperature
“STOP”
Brewer is
“READY”
Hot water tank
is heated and full
Hot water tank
temperature (°C)
FETCO CBS-2111 home screen
Menu 1 of 8
Menu 3 of 8
Purge Key
FETCO CBS-2111 recipe screen
Menu 2 of 8
Menu 4 of 8
Continue to
Menus 5-8
STOP
<5 sec 90°C
90°C
[[¯]] 6.00L
90°C
[[¯]] 6.00L
90°C
[[¯]] 6.00L
1
3
2
4
TBS_2111
© 2016 all rights reserved
XTS
EXTRACTOR
TOUCHSCREEN
90°C
<5 Sec

Related product manuals