EasyManua.ls Logo

Filtech DP 200 - Conditions of Use and Period of Use

Filtech DP 200
36 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
- 9 -
English
5 - CONDITIONS OF USE AND PERIOD OF USE
Reverse osmosis system - processing essentially consists in an adjustable reduction of
xed residue in treated water.
The machine is intended for use in a closed and protected environment, not outdoors.
Its use consists of treating and supplying drinking water for human consumption and
for technical use. Any other use is not permitted.
Attention: This equipment requires regular maintenance to guarantee the
potability requirements of the treated drinking water and to maintain the im-
provements declared by the manufacturer of the reverse osmosis system for
household use, to treat drinking water. Equipment for the treatment of drinking
water. Input water must be drinkable according to Ministerial Decree no. 31
of 2 February 2001.
Summary table for time of use and maintenance methods
Time Assessment method Action
Time of use 10 years
Installation booklet
present
Service by
manufacturer or
disposal
Activated carbon filter
life
Most critical condition:
12 months or
exhaustion
Board signalling
Replacement and
sanitisation
Membrane life
Most critical condition:
2 years or exhaustion
Installation booklet
present
Replacement and
sanitisation
Machine off without
electrical supply
Over 10 days or time
uncontrolled
Ascertain by calendar
Filter replacement and
sanitisation
Drainage restrictor Each lter change Board signalling Restrictor replacement
For the maintenance method, see the specic chapter.
Specic tests were carried out to dene the time of use and the maintenance methods.
Furthermore, a water sample was analysed to verify for altered parameters and for
compliance with Ministerial Decree no. 31 of 2 February 2001.
Important: After installation, the machine must be powered on for hygiene
reasons (ushing) and for a correct management of the exhausted lter.
Sanitise and replace the pre-lter after periods of disuse longer than 10 days
in the absence of electrical power supply.
Please nd below the potability test results for water samples taken before and after DP. Both
tests, carried out by an accredited institute, conrm the water as drinkable. In particular, it is
conrmed that treatment efficiently reduces various parameters, in particular conductivity,
hardness and various chemical substances.