CONTENTS
1
FOREWORD
1. INTRODUCTION - P. 2 - 3
Health & Safety
Fuel Spillage
First Aid
2. OPERATING INSTRUCTIONS - P. 4 - 5
2a Boiler controls
2b Operating procedure
2c Burner lock out
3. INSTALLATION - P. 6 - 8
3a Standards & Regulations
3b Installation in New Zealand and Australia
3c Positioning Boiler
3d Room Seald Balanced Flues
4. FLUE SYSTEMS - P. 9 - 17
4a Important notice
4b Balanced flue systems
4c Concentric flue systems
4d Boiler siting regulations & Standards
4e Ventilation and Combustion Air
1. Conventional Flue
2. Balanced Flue
4.f Domestic Htc. & H.w. Systems electrical supply
5. OIL SUPPLY - P. 18 - 19
5a Oil storage tank siting
5b Flexible oil pipe(s)
5c Single pipe system
5d Two pipe systems
5e Tigerloop single pipe systems
6. COMMISSIONING - P. 20
6a Procedures
6b Handing over
7. SERVICING - P. 21
7a Recommended service intervals
7b The oil tank
7c The boiler
7d The Burner
8. FAULT FINDING - P. 22 & 23
9. TECHNICAL SPECIFICATIONS - P. 24 - 30
9a Boiler Dimensions
9b Boiler Specifications & Recommendations Etc.
9c Oil Burner Performance Specification
9d & e Riello Oil Burner Specification & Technical Details
9g & i Thermostat Control & Wiring
SYSTEM PART 2.
Sealed System & Domestic Heating - Page 31 - 36
SYSTEM PART 3.
10. SPARE PARTS - P. 37 - 48
10a Riello RDB burner illustration & parts
10b Riello burner illustration & parts
10c Pluming parts illustration
10d Pluming parts description
10e Boiler parts illustration - System Range 50/70 - 70/90
10f Boiler parts description - System Range 50/70 - 70/90
10g Boiler parts illustration - System Range 90/120 - 120/150
10h Boiler parts description - System Range 90/120 - 120/150
10i Boiler parts illustration - System Heat Pac 70
10j Boiler parts illustration - System Heat Pac 70/90
10k Boiler parts illustration - System Heat Pac 90/120 - 120/150
10. RECORDS & REPORTS - P. 49 - 51
Commissioning record Page 49
Service reports Page 50 & 51