Installation Instructions
Seite/Page 56 - Kaptitel/Chapter 5: Installation Instructions 20.7.15
5.3 Generator connections
Connect all electrical wires within the capsule tightly to the motor and the generator. This is also the case for fuel
lines and cooling water lines.
ATTENTION!: Danger to Life - High voltageThe electrical connections MUST be carried out
according to the respective valid regulations. This also
concerns used cable materials. The cable supplied is
meant for laying "protected" (i.e. in pipe) at a
temperature up to a max of. 70°C (160°F). The on-board
circuit must also be fitted with all essential fuses.
For the original location of the connection points, see the generator description.
5.4 Installation of the cooling system - raw water
5.4.1 General information
The genset should have its own raw water (coolant water) inlet and should not be connected to any other engine
systems. Ensure that the following installation instructions are complied with:
5.4.2 Fischer Panda installation kit - raw water
Note:The following additional components will be required for
the specified installation. You can purchase them as an
installation kit or separately at Fischer Panda.
Fig. 5.4.2-1: Thru hull fitting with strainerThrough hull fitting with strainer
Fig. 5.4.2-2: Sea cockSea cock