EasyManua.ls Logo

Fleck 5800 SXT - Installing the Fleck 5800 SXT Valve; Valve Preparation and Attachment

Fleck 5800 SXT
16 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
PAGE 7Help: 888-426-5001 QualityWaterForLess.com
3) Before filling the tank, place a piece of painter’s
tape over the top of the riser to prevent resin
from dropping down inside the riser tube as
shown in
Figure 7-A. i Avoid using duct
tape which leaves behind unwanted residue
4) Place the included filling funnel over the top of
the tank as shown in
Figure 7-B
and prepare to
fill the tank. If your softener system came with
gravel
, please pour this into the tank
first
, then
pour in the included resin media afterwards
FIGURE 7-A FIGURE 7-B
3 ›INSTALLING THE FLECK 5800 SXT VALVE
1) Remove the filling funnel and tape and while
using the included silicone lubricant packet, lu-
bricate the inner and outer o-rings on the bottom
of the Fleck 5800 SXT Meter Valve as shown in
Figures 7-C and 7-D
2) Next, install the
top screen (standard OR fine
mesh)
to the bottom of the Fleck 5800 SXT Meter
Valve as seen in Figure 7-E and then place the
valve onto the top of the tank, being sure that the
riser tube fits into the central o-ring on the valve,
as shown in Figure 7-F.
Hand-tighten
the valve to
the tank.
Do not use Teflon tape or pipe dope
on the valve or tank threading
FIGURE 7-C FIGURE 7-E
FIGURE 7-D
FIGURE 7-F
STANDARD
FINE MESH

Related product manuals