EasyManua.ls Logo

Floe VSD 6000 - Page 32

Floe VSD 6000
36 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
32
STEP 6
-ATTACH CONTROL BOX
PLACE 1/2-13 X 1 1/4" CUSTOM BOLT INTO NUT TRACK ON SHORE SIDE OF PIVOTING
POST AT NEAREST AVALABLE LOCATION (FIG 1).
PLACE CONTROL BOX BRACKET ON CUSTOM BOLT, AND PLACE NUT ON BOLT.
TORQUE TO 60 FT/LBS (FIG 2). NOTE THAT THE BOX HANGS INSIDE THE LIFT.
FIG. 2
FIG. 1

Related product manuals