EasyManua.ls Logo

Fluke 77 - Basic Measurement Procedures; Measure AC and DC Voltage; Measure Resistance; Measure Capacitance

Fluke 77
20 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Model 77 Series IV
Calibration Information
10
LCD Mask
aik15f.eps
Figure 3. Removing the LCD Mask
Performance Tests
The following performance tests verify the complete operation of the Meter and check the accuracy of
each Meter function against its specifications. The recommended calibration interval is 12 months. If the
Meter fails any part of the test, calibration adjustment and/or repair is indicated.
In the performance tests, the Meter is referred to as the unit under test (UUT).

Other manuals for Fluke 77

Related product manuals