EasyManua.ls Logo

Fluke OPTIVIEW XG - Page 35

Fluke OPTIVIEW XG
68 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
31
Operating the OptiView XG on Battery Power
The OptiView Power Control screen will appear, as shown.
2. Switch off Wireline Ports A, B, C, and D. This will approximately double
battery operation time.
3.The system must reboot to make the change. Select the Save and Restart
button.
Note
Remember to switch on Wireline Ports A, B, C, and D before attempting to use the Network Ports!

Table of Contents