Vertical stabilizer installationBall Link Installation]
1. Attach the ball link to the elevator control horn’s outermost
hole using the included linkage rod as shown.
2. Attach the ball link to the rudder control horn’s outermost
hole using the included linkage rod as shown.
5
EN
Model Assembly
Vertical stabilizer installation
Landing Gear Set Installation
HKM3.0*26
Vortex Generator Installation
1. With the fuselage bottom facing up, carefully Install
the landing gear set to the fuselage with theincluded
landing gear insert and screws as shown.
1. Install the vortex generators in place as shown.