EasyManua.ls Logo

Force JX-1300 - Page 11

Force JX-1300
24 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
STEP 5
A) Attach the Upper Cable(75#) through the bracket of Upper frame(4#), Make
sure that the ball stopper should be underneath the frame.
B) Attach one pc Pulley (60#) to the bracket and secure them with one pc
M10*45 Allen Bolt(104#), two pcsφ10 washer(100#) and one pc M10 Aircraft
Nut(97#).
C) Draw the Upper cable(75#) backwards and to the top bracket of the vertical
frame(3#) and then repeat the procedure B to install a pulley.
D) Draw the cable towards the pulley and through the centre of the front press
frame(5#) and then repeat the procedure B to install one pc pulley.
E) Draw the Upper cable(75#) backwards through the hole on the front vertical
frame(3#)and repeat the procedure B to install one pc pulley.
F) Draw the Upper cable(75#)downwards and place one pc pulley onto the cable ,
Secure the pulley to the double floating pulley bracket(17#) with one pc
M10*45 Allen Bolt(104#), two pcsφ10 washer(100#) and one pc M10 Aircraft
Nut(97#).
G) Draw the cable around the pulley upwards , place two pcs pulley to the
opening of rear of the upper frame (4#) and secure them with two pcs
M10*45Allen Bolt(104#) ,four pcs φ 10 washer(100#) ,two pcs L-shape
separation blade(117#),two pcs M10 Aircraft Nut(97#).
H) Draw the cable downwards between the two Guide Rod(13#)to the Selector
Rod (12#),thread the bolt into the opening on the top of the Selector Rod to
secure the cable.
NOTE: Tighten or loosen the end bolt of the upper cable(75#)can adjust the
tension of the cable system. Please make sure the bolt screw inside of the
weight selector rod (12#) at least 5 laps.
10

Related product manuals