STEP 7
A)Remove the Double Strap Buckle(74#) and ball stopper from the end of Lower
cable(77#) , so that the lower cable(77#) would go through the holes .
B)Attach the low cable(77#) to the opening of the leg developer(9#),make sure that
the ball stopper should be on the front of the leg developer. Attach one pc Pulley
(60#) into the opening and secure them with one pc M10*45 Allen bolt(104#),two
pcsφ10 washer(100#),one M10 Aircraft Nut(97#).
C)Attach the cable backwards of the machine through the second bracket and the
opening of the front vertical frame(3#),attach two pcs pulley(60#) onto the cable
and secure them with two pc M10*45 Allen bolt(104#),four pcsφ10
washer(100#),two M10 Aircraft Nut(97#).
D)Draw the cable upwards, place one pc pulley(60#) behind the cable and Secure
the pulley to the another side of Cross double floating pulley bracket(18#).
E)Draw the cable downwards, place one pc pulley onto the cable and secure the
pulley to the bracket with one pc M10*45 Allen bolt(104#),two pcs φ 10
washer(100#),one M10 Aircraft Nut(97#).
F)Draw the cable upwards, and place one pc pulley behind the cable, Attach the
pulley to the double floating pulley bracket and secure them with one pc M10*45
Allen bolt(104#),two pcsφ10 washer(100#),one M10 Aircraft Nut(97#).
G)Draw the cable downwards and place one pc pulley onto the cable, and then
secure the pulley to the bracket of the front vertical frame(3#).
H)Draw the cable upwards, through the opening of the front vertical frame(3#), place
one pc pulley into the opening and secure it with one pc M10*65 Allen
bolt(109#),two pcsφ10 washer(100#),and one M10 Aircraft Nut(97#).
I)Attach the Double Strap Buckle(74#) to the end of low cable(77#), and secure them
with one pc M10*30 Allen Bolt(113#), two pcsφ10 washer(100#), and one pc M10
Aircraft Nut(97#).
13