shows.
B. Draw the cable downwards and place 1pc pulley onto the cable,Secure it with 1PC M10X45 Allen bolt
(61#),2pcs φ10 washer (69#) and 1pcM10 Aircraft nut (68#).
C.Draw the cable around the cable and backwards, Place 1pc pulley onto the cable, Secure it with the
same way in B.
D. Draw the cable around the pulley and upwards and place 1 pc pulley below the cable,Secure it with
the double floating pulley bracket(36#) with the same way in B.
E. Draw the cable around the pulley and downwards,Place 1 pc pulley onto the cable and secure it with
the same way in B.
F. Draw the cable backwards,Repeat the same way in B .
G. Draw the cable around the pulley and upwards,Place 1 pc pulley below the cable and secure it with
the same way in B.
H.I,J,K,L,M Repeat the same way in F,E,D,C,B,A to install the half side.