EasyManua.ls Logo

Ford Pro 48A - Grounding Instructions; Tools and Parts Required

Ford Pro 48A
33 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
US Type Charger 48A Installation Manual Rev0.1
Ford Pro contact info: chargingsupport@fordpro.com and 1-800-34-FLEET
14
The charge point must be installed only by a licensed electrician in
accordance with the provisions of the local electrical industry construction
and should comply with National Electrical Codes and standards.
Before installing the charge point, make sure you have read all of these
instructions in this manual and fully understand its contents.
Appropriate protection is required when connecting to a main switchboard.
The tools and parts used as outlined in the section “Tools & parts required
for installation”.
3.1.2 Grounding instructions
The charge point must have equipment grounding through a permanent
wiring system or an equipment grounding conductor. Use a wire with a
dedicated grounding wire and a ring terminal and connect to the equipment
ground terminal block for grounding.
3.2 Tools & parts required for
installation
Table 3-1 Tools & parts required for installation
Tool
Qt
y
Model
Size
Incl
.
Remark
Mounting
Bracket
1
All
222x173x9
mm
Yes
Fasten charge point to
the wall.
Holster
ASSY
1
All
58x58x70
mm
Yes
Hold EV charging plug
Screw
4
All
Tapping:
#12
Yes
Fasten Mounting Bracket
& Holster
Mechanical:
M6
Yes
1
All
Mechanical:
M6
Yes
Fasten charge point &
Mount Bracket
Wire,
Copper
3
All
6 AWG x 2,
8AWG x 1
(ground)
No
Heat
Shrink
3
All
6 AWG x 2,
8AWG x 1
No
Protect wires &
terminals.
CAUTION: Cord extension sets are not allowed to be used.

Related product manuals