US Type Charger 48A Installation Manual Rev0.1
Ford Pro contact info: chargingsupport@fordpro.com and 1-800-34-FLEET
The charge point must be installed only by a licensed electrician in
accordance with the provisions of the local electrical industry construction
and should comply with National Electrical Codes and standards.
Before installing the charge point, make sure you have read all of these
instructions in this manual and fully understand its contents.
Appropriate protection is required when connecting to a main switchboard.
The tools and parts used as outlined in the section “Tools & parts required
for installation”.
3.1.2 Grounding instructions
The charge point must have equipment grounding through a permanent
wiring system or an equipment grounding conductor. Use a wire with a
dedicated grounding wire and a ring terminal and connect to the equipment
ground terminal block for grounding.
3.2 Tools & parts required for
installation
Table 3-1 Tools & parts required for installation