EasyManua.ls Logo

FoxESS KH10 - Page 25

FoxESS KH10
48 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
22
This inverter has an integrated export management function. To enable this function, a power meter or
CT must be installed. The CT should be clamped on the main live line of the grid side. The arrow on the
CT should be pointing towards the grid. The white cable connects to CT+, and the black cable connects
to CT-.
Meter/CT setting:
Short press the touch key to switch display or make the number+1. Long press the touch key to confirm
your setting.
If there is another generator in the home, CT2 can be used to record the power generated by the
generator and transmit the data to the website for monitoring.
Settings
Feature Parm
Meter/CT

Related product manuals