EasyManua.ls Logo

FP PostBase Vision - Step 2: Assembling the PostBase Vision

FP PostBase Vision
40 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
PostBase Vision
20
Load postage / Contact data centre
In order to frank, the PostBase Vision must
have corresponding postage credit. This re-
quires contact with the data centre.
Follow the instructions on the display.
Home screen (example) Installation complete
When PostBase Vision displays the Home
screen, the franking machine installation has
been successfully completed.
To install the “PostBase Vision Feeder”, con-
tinue with Step 7.
The M
ENU button is used to access other
system settings (e.g. PIN protection, standby
time).
Volume, display inclination and brightness
can be adjusted directly on the display frame.

Other manuals for FP PostBase Vision

Related product manuals