FPI P36-3 Zero Clearance Direct Vent Gas Fireplace
64
THE KENSINGTON & BALMORAL FRONT
2-PANEL DOOR INSTALLATION
PALACE SERIES OPTIONS
Secure bottom of
sub-frame with
screws.
1) Install sub-frame by hooking top over glass door, push in bottom
of frame and secure with 2 screws.
Sub-Frame
2) Mount 2-panel door frame to flange on sub-frame, ensuring to line
up holes. Secure using the 6 screws provided.
3) Hook left side door to door frame by placing the door hinges (top
& bottom) over pins on door frame. Repeat for right side door.
Note: It will be easier to put the door in place by starting with the
bottom hinge.
Left Side Door
Pin on door frame
Note: If you find that the left or right side door is lower then the other,
use the spacer provided to help align the doors.
The spacer is to be placed over the bottom pin before installing the
screen door.
Spacer