Troubleshooting
Document Number: TD-104406/0Order Number: 1H329021/0
Machine error codes 7
Boiler supply errors
Error
code
Error text on the
display
Meaning Solution
36 Add coffee
Boiler 1 could not be filled in the prescribed
time of 4 min.
Heater and pump will be switched off.
` Restart machine.
` Check pump pressure, see Section 2 -
Commissioning, VI.Commissioning, p.
22.
` Check Boiler 1 (coffee) pressure-relief
valve for seal (water flow in drip tray).
` Check water supply (seal and supply).
37 Fill HW/S boiler
Boiler 2 could not be filled in the prescribed
time of 4 minutes (first-time filling).
Heater and pump will be switched off.
Spectra S: Hot water/steam
` Restart machine.
` Check Boiler 2 (hot water/steam)
pressure-relief valve for seal (water flow in
drip tray).
` Check the level sensor (connection/lime
deposits), see Section 6 - Programming,
V.Programming, 9. Input ports, 9.2 B2
NTC Boiler 2, p. 117.
` Check water supply (seal and supply).
38 Fill HW/S boiler
Boiler 2 could not be refilled in the prescri-
bed time of 3 min.
Heater and pump will be switched off.
Spectra S: Hot water/steam
` Restart machine.
` Check Boiler 2 (hot water/steam)
pressure-relief valve for seal (water flow in
drip tray).
` Check the level sensor (connection/lime
deposits), see Section 6 - Programming,
V.Programming, 9. Input ports, 9.2 B2
NTC Boiler 2, p. 117.
` Check water supply (seal and supply).
Error
code
Error text on the
display
Meaning Solution
29 Over temperature
Spectra X: Storage container temperature is
20 °C above the target value indicated in the
Install menu, see Section 6 - Programming,
V.Programming, 1. Machine, 1.9 Temperature
store, p. 36.
` Check the temperature sensor and
replace it, if necessary.
` Check the heater.
` Check the connections.
` Restart machine.
30 Coffee post-hea-
ting
The heater for boiler 1 (H1) has not reached the
target value within the prescribed time.
Spectra S: Coffee heating; Timeout 6 min.
` Please wait.
The error will be canceled once the target
temperature is reached.
30 HW/S post-hea-
ting
The heater for boiler 1 (H1) has not reached the
target value within the prescribed time.
Spectra X: Hot water heating: Timeout 3 min.
` Please wait.
The error will be canceled once the target
temperature is reached.
31 HW/S post-hea-
ting
The heater for boiler 2 (H2/H3) has not
reached the target value within the prescribed
time.
Spectra S: Hot water/steam heater; Timeout
3 min.
` Please wait.
The error will be canceled once the target
temperature is reached.
31 Coffee post-hea-
ting
The heater for boiler 2 (H2/H3) has not
reached the target value within the prescribed
time.
Spectra X: Coffee heating. Timeout 6 min.
` Please wait.
The error will be canceled once the target
temperature is reached.