Table 2 lists all maintenance operations that are to
be performed at the initial maintenance (IM) interval.
Maintenance operation numbers are reference num-
bers used to help you find detailed instructions in this
manual on the maintenance operations to be per-
formed. All operations listed in Table 2, along with
the operations listed in the M1 Maintenance Interval
Operations table (Table 3) must be performed to
complete the initial maintenance (IM).
Initial Maintenance (IM) Operations
Number Title
00-03 Perform All M1 Maintenance Interval Operations
31-01 Frame Fastener Torque Check
32-03 Suspension U-Bolt Torque Check
33-04 Alignment Check
42-12 Bendix Automatic Drain Valve Operating and Leakage Tests
*
47-01 Fuel Tank Band Nut Tightening
*
The automatic drain valve should be inspected every 6 months or 1500 operating hours, whichever comes first.
Table 2, Initial Maintenance (IM) Operations
General Information 00
00–02 Initial Maintenance (IM) Operations
108SD and 114SD Maintenance Manual, April 2021 00/3