610.020-IOM (NOV 19)
Page 17
EVAPORATOR AND AIR COOLER
INSTALLATION - OPERATION - MAINTENANCE
MBK/AGBK/MGBK
Step 1
Units are shipped stacked, but individually skidded.
Step 2
Remove all crating from the top and sides of skids. Leave
units on skids.
Step 3
Place forks under the full span of the skid.
Step 4
Secure hangers to the ceiling. Remove all shipping legs
and skid from the unit.