EasyManua.ls Logo

Frick AGHN - Rigging; Aghn;Ghn;Gghn;Mhf (<071 Ø)

Frick AGHN
22 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
610.020-IOM (NOV 19)
Page 12
EVAPORATOR AND AIR COOLER
INSTALLATION - OPERATION - MAINTENANCE
RIGGING
AGHN/GHN/GGHN/MHF (<071 Ø)
Step 1
When shipped, units are stacked, but individually skidded.
Step 2
Separate the top unit from the lower unit.
Step 3
Remove all crating from the top and sides of the skid.
Leave the unit on the skid.
Step 4
Secure hangers to the ceiling. Remove all shipping legs
and the skid from the unit.

Related product manuals