EasyManua.ls Logo

Friedrich SQ05 - Items Required for Installation; Recommended Tools for Installation

Friedrich SQ05
36 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
22
FRR084
ITEM #2
ITEM #3
ITEM #4
ITEM #5
ITEM #6
ITEM #1
ITEM #9
ITEM #8
ITEM #10
ITEM #7
ITEMS NOT TO SCALE
Items required for installation (provided in straight cooling units only)
ITEM NO DESCRIPTION QTY.
1
2
3
4
SCREW, SHEET METAL, #8 x
"
SCREW, PHILLIPS, TRUSS HEAD, #8 x ½"
SCREW, HEX, #8 x "
SCREW, PHILLIPS, #8 x 1 ¼"
8
4
10
2
5
6
GRAY GASKET, FOAM, 1" x 1 ½" x 42"
WHITE GASKET, FOAM, 1" x 1 ½" x 48"
1
1
ITEM NO DESCRIPTION QTY.
7
8
LEFT SIDE CURTAIN ASSEMBLY
RIGHT SIDE CURTAIN ASSEMBLY
1
1
9
10
CABINET OR SLEEVE w/ TOP ANGLE BAR
(TOP ANGLE BAR NOT INCLUDED ON EQ)
AIR CONDITIONING UNIT w/ DECORATIVE
FRONT PANEL
1
1
1
Recommended tools required for installation: (not included)
HEXHEAD SCREWDRIVER
COMMON SCREWDRIVER
PHILLIPS SCREWDRIVER

Related product manuals