EasyManua.ls Logo

Friedrich SQ05 - Thru-the-wall Installation

Friedrich SQ05
36 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
28
Thru-the-wall Installation
STEP 1. $IWHUUHPRYLQJWKHXQLWIURPVKLSSLQJFDUERQVOLGHFKDVVLVRXW
of cabinet (See Figure 16, page 25).
STEP 2. 5HPRYH the shell channel from the top of the cabinet (See
Figure 15, page 24).
NOTE: 1RWDSSOLFDEOHWRKHDWSXPSPRGHOVVROGZLWKRXWTXLFNPRXQWLQJ
cabinet.
WARNING
Falling Object Hazard
Not following Installation Instructions
for mounting your air conditioner can
result in property damage, injury, or
death.
STEP 3. /$<287&XWDQGIUDPHLQDQRSHQLQJLQWKHGHVLUHGZDOODUHD
using the illustration as a guide (See Figure 23).
STEP 4. Place the cabinet in the framed opening.
NOTE: Measure and shim void spaces between the side of cabinet and
wood framing before securing to wall.
STEP 5. 3RVLWLRQWKHIURQWHGJHWRH[WHQGLQWRWKHURRPPLQLPXP
at top of cabinet and 1" minimum at bottom (See Figure 24).
STEP 6. 6HFXUHHDFKVLGHRIWKHFDELQHWZLWK1R[KH[KHDG
VFUHZVLWHPSDJHRUQDLOVWKURXJKWKHKROHVLQWKH
sides.
NOTE: $OWHUQDWHIDVWHQHUV ZKLFKPD\EH XVHG IRU VHFXULQJWKH XQLW
cabinet to a wall, including masonry walls, are not furnished
(available at local hardware stores).
FRR091
FINISHED OPENING SIZE
2 x 8 FRAME
20
20
14-1/4
14-1/4
CONCRETE BLOCK CONSTRUCTION FRAME CONSTRUCTION
EXPANSION ANCHOR BOLT
MOLLY OR TOGGLE BOLT
Figure 23

Related product manuals