Installation Instructions
For Heavy Duty
Please read ALL instructions before installing. Two people are
recommended to install this product. Ifa new electrical outlet
is required, have the outlet installed by a qualified electrician
before installing unit. See#5 in Preliminary Instructions
following.
Preliminary Instructions
Do the following before starting to install unit. See illustrations
below.
1. Check window opening size - the mounting parts furnished
with this air conditioner are made to install in a wooden
sill double-hung window. The standard parts are for a
window opening of 31 "(711 mm) minimum to 42"( 1067
rc_n) maximum width. Open sash to a minimum of 19"
(483 mm). (FIG. 1)
2. Check condition of window - all wood parts of window
must be in good shape and able to firmly hold the needed
screws. If not, make repairs before installing unit.
WINDOW SASH SEAL
3/4" LONG HE)( HEAD
SCREW
WASHERHEAD
FRAME
ASSEMBLY
(LEII)
SDE RETAINER
SEAL-BOI tOM RAIL TC UNIT
I/2'LOFIG
SCREWS AND "_i FRAME
O_'KN JTS _ ASSEMBLY
\._ _#W-! (lEFT)
OCKNJ [ _ WINDOW _!IPPORT
3/4 'LONG
D_____ " BRACKET
BOLT SI ANGI
BRACKET
3. Check your storm windows - if your storm window
frame does not allow the clearance required, correct by
adding a piece of wood as shown in FIG. 2, or by removing
storm window while room air conditioner is being installed.
(continued)
FIG. 1
_ SASH
T
19" MIN.
STORM WINDOW FRAME OR
OTHER OBSTRUCTION
FIG. 2 [_SASH
1
19" MIN_
112"MIN 1 1/2"MIN.
ENTIRE STOOL. FASTEN
STORM WINDOW FRAME OR WITH TWO NAILS OR
OTHER OBSTRUCTION SCREWS.
309000906(11/03)