EasyManua.ls Logo

Froling TX 150 - Page 3

Froling TX 150
68 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4.5.17 Installing the actuators of the air flaps 41
4.5.18 Installing overpressure monitor and temperature sensor 42
4.5.19 Installing the underpressure measurement 43
4.5.20 Installing the WOS drive 44
4.5.21 Heat exchanger ash removal unit with ash box 46
4.5.22 Heat exchanger ash removal unit with ash screw (optional) 47
4.5.23 Installing the combustion air blower fan 54
4.5.24 Installing the STL and the boiler sensor 55
4.5.25 Installing the ID fan 56
4.5.26 Installing the FGR air box (optional) 57
4.5.27 Installing the flue gas recirculation FGR (optional) 58
4.5.28 Installing insulating door and cover plates 60
4.6 Electrical connection 61
4.6.1 Installing insulating covers and cover plates 61
4.7 Connecting the thermal discharge system 64
5 Start-up 65
5.1 Before commissioning / configuring the boiler 65
5.2 Initial startup 66
5.2.1 Permitted fuels 66
Wood pellets
66
Wood chips
66
5.2.2 Heating up for the first time 66
6 Decommissioning 67
6.1 Mothballing 67
6.2 Disassembly 67
6.3 Disposal 67
7 Appendix 68
7.1 Addresses 68
7.1.1 Address of manufacturer 68
7.1.2 Address of the installer 68
Contents
Installation Instructions TX 150-250 | M1320112_en 3

Table of Contents

Other manuals for Froling TX 150

Related product manuals