EasyManua.ls Logo

Fronius FK 2500 - Page 19

Fronius FK 2500
40 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
The shaft sealing surfaces inside the coolant pump are lubricated by the coolant, mean-
ing that a certain leakage flow should always be expected. A low leakage flow is permit-
ted.
The coolant pump requires a certain warm-up time after being started for the first time or
upon restarting after a long period of downtime. An increased leakage flow can occur
during this warm-up phase. The leakage flow will normally sink back down to a low level
after the warm-up phase. If this is not the case then contact After-Sales Service.
19
EN

Table of Contents