56
The startup test takes five minutes. The time elapsed is indicated by a bar shrinking 
from the top down.
Whenever two scale divisions stop flashing and disappear, 1/10 of the total duration 
of the test is over. 
Operation of 
Feeding Energy 
into the Grid
- Once the tests have been completed, the inverter starts feeding power into the grid.
- The display shows the present power feeding into the grid.
- The Operating Status LED lights up green, and the inverter starts operating.