EasyManua.ls Logo

FS S5300-12S - Installation Requirements; Site Environment

FS S5300-12S
43 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3
EN
Installation Requirements
Before the installation, make sure that you have the following conditions
ready:
Phillips screwdriver, related bolts and ESD tools.
Standard-sized, 19" wide rack with a minimum of 1U height available.
Fiber optic cables and ber transceivers.
Site Environment
Ensure that the operating temperature is maintained at 0°C~45°C.
Ensure that the operating humidity is maintained at 5%~95%.
The installation site must be free from leaking, dripping water, heavy dew, or humidity.
Keep the installation site dust-free.
The installation site must be well-ventilated. Ensure that there is adequate airow around the
switch.
Ensure that the switch is level and stable to avoid any hazardous conditions.
Ensure that the rack and the working platform are well-earthed.
Do not disassemble the enclosure of the device.
Cut o the power supply before cleaning the device. Do not use any liquid to wipe the device.
Keep the device away from electric lines of force, lamps and power grids.
Ensure that the rack and the working platform are rm enough to support the weight of a switch
and its accessories for installation.
Ports
Description
SFP
CONSOLE
SFP+ ports for 10G connection
An RJ45 console port for serial management
S5300-12S
2 3 41 65

Related product manuals