EasyManua.ls Logo

Fujitsu AIRSTAGE AJ 090LALDH Series - Opening the Knockout Hole; Pipe Connection

Fujitsu AIRSTAGE AJ 090LALDH Series
23 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
En-9
Header
C
H
1
α
1
β
1
D
H
2
α
2
β2
GOOD
GOOD
Horizontal line
Horizontal line
View
D
View C
Horizontal line
Vertical line
Gas pipe
Liquid pipe
Outdoor
unit side
Outdoor
unit side
H
1
= 0 to 10 mm
H
2
= 0 to 10 mm
(α
1
: 0° to 1°)
β
1
: -10° to 10°
(α
2
: 0° to 1°)
β
2
: -10° to 10°
PROHIBITED
CAUTION
Do not connect a separation tube after a header.
Leave the distance 0.5 m or more for straight part to branch tube and header.
To indoor unit
To indoor unit
To indoor unit
Main pipe
Main pipe
0.5 m or more
0.5 m or more
To indoor unit
Separation tube
Header
To indoor unit
0.5 m or more
0.5 m or more
To indoor unit
Separation tube
Header
5.3. Opening the knockout hole
CAUTION
Be careful to prevent panel deformation or damaged while opening the knockout hole.
To prevent cutting of the wiring after the knockout hole was opened, remove the burrs
along the edge.
In addition, to prevent rusting, painting the edge with rust preventive paint is recom-
mended.
The piping can be connected from 2 directions; the front or the bottom.
(Knockout holes are provided so that the piping can be connected from 2 different direc-
tions.)
Use the front knockout hole, as required.
75
95
10
100
43
73
199
125
Fig. A Knockout position
Fig B Detail of knockout position
(bottom)
Fig C Detail of knockout position
(front)
(Unit: mm) (Unit: mm)
Knockout
hole
Knockout hole
5.4. Pipe connection
CAUTION
Do not use mineral oil on a flared part. Prevent mineral oil from getting into the system
as this would reduce the lifetime of the units.
While brazing the pipes, be sure to blow dry nitrogen gas through them.
The maximum lengths of this product are shown in the table. If the units are further
apart than this, correct operation cannot be guaranteed.
5.4.1 Bending pipes
CAUTION
To prevent breaking of the pipe, avoid sharp bends. Bend the pipe with a radius of
curvature of 100 mm or more.
If the pipe is bent repeatedly at the same place, it will break.
• If pipes are shaped by hand, be careful not to collapse them.
• Do not bend the pipes at an angle of more than 90°.
• When pipes are repeatedly bent or stretched, the material will harden, making it difficult
to bend or stretch them anymore.
• Do not bend or stretch the pipes more than 3 times.
5.4.2 Removing the pinch pipe
WARNING
Remove the pinch pipe only when the internal gas is completely drained as shown on
the below instructions.
If gas still remains inside, the piping may crack if you melt the brazing filler metal of the
junction area with a burner.
Before connecting the piping, remove the pinch pipe in accordance with the following
instructions:
(1) Verify that the liquid
side, suction gas side
and discharge gas
side 3-way valves are
closed.
(2) Cut the end of the
liquid side, suction gas
side and discharge gas
side pinch pipe and
vent the gas inside the
pinch pipe.
(3) After all the gas is
vented, melt the
brazing filler metal on
connecting part using
a torch and remove
the pinch pipe.
3-way valve
Pinch pipe
End of pinch pipe
5.4.3 Pipe connection
CAUTION
Seal the pipe route hole with putty (Locally purchased) such that there are no gaps.
Small insects or animals that are trapped in the outdoor unit may cause a short circuit in the
electrical component box.
To prevent pipe damage; do not make sharp bends.
Bend the pipe at a radius of 70 mm or greater.
Do not bent pipe many times at same part to prevent break.
After completing all the pipe connection by brazing, perform the indoor unit pipe connec-
tion with a flare joint.
When removing the pinch pipe or brazing the joint pipe, carry out the work while cooling
down the 3-way valve sufficiently.
• Braze the joint pipe onto the 3-way valves at the liquid, suction gas and discharge gas
side.
Install the joint pipe appropriately so that it can be connected easily with the main pipe.
• Braze the joint pipe at the liquid, suction gas and discharge gas side with the main pipe.
* Be sure to supply nitrogen when brazing.