EasyManua.ls Logo

FUWI Pellets Boilers - Assembly of PCV Pipe Connector; Safety at Work Conditions

FUWI Pellets Boilers
16 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
PCV pipe diameter 60mm, length 300mm
Assembly of PCV pipe in FUWI Pellets Boiler (back of the boiler feeder)
A) B)
page 8
1. Boiler has to be placed according to fire-safety standards, relating to solid fuels heating
sources assembled in closed rooms PN -87 / B -02411.
2. It is prohibited to use burning materials other then inflammable materials that provided in
service instruction.
3. It is prohibited to assemble any valves on return pipes of central heating system.
4. Controller socket to which the feeding connection is made, should be earthed.
5. Installation of central heating is safe as open system installation PN - 91 / B -02413. Boiler
can also be installed in closed system arrangements, but under condition of using of
additional equipment for device or by use the excess of warmth distributing
circulations through exchanger PN -99 / B -02414.
6. Switching boiler off after heating season is made by pressing switch off button and boiler as
well as steered devices will be disengaged. It should be made for cleaning of boiler.
7. Full shutdown of boiler is made by extraction of boiler connector from feeding socket.
It is prohibited and illegal to refill water during work of boiler, especially when
boiler is strongly hot, because in this way it is possible to cause damage or shake
water block.
Please remember, before cleaning smoke tubes, remove upper plate of burner
(building of burner).
page 21
ASSEMBLY OF PLEX (PCV PIPE) CONNECTOR TO FUEL FEEDING SYSTEM
SAFETY AT WORK CONDITIONS