4、Selecting a Location
1)Select a correct location to place the unit。
2)Determine input power cord length according to its actual operation
requirement.Input power cord must have a minimum inside diameter of
2
6mm。
3)Do not move or operate unit where it could tip。
4)Use cart or unit handle to move unit .Do not pull the cords to move
unit.
5)Moving gas cylinder and main unit to hight sparaely.Use lifting eye
to lift unit only ,not running gear,gas cylinders,or any other ac-
cessories.
6)Optional order for individual wire feeder is available.The wire fe-
eder and welding gun divide from the main unit.It is more convenient
to operate.
Page.8