EasyManua.ls Logo

FY-TECH FY-4200/2E - Duty Cycle and Overheating; Overheat Protection and Cooling Procedures

Default Icon
34 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2.Duty Cycle And Overheating
1.Overheat protection is installed on the aluminium board of main
transformer and rectifier.The unit products heat while welding.
2.If unit overheats ,output stops, and cooling fan runs.
3.Wait fifteen minutes for unit to cool.Reduce amperage or voltage,
or duty cycle before welding.
Overheating Stop working
Wait 15 minutes
for unit to cool
Reduce amperage
or reduce duty
cycle
0
15
A
Weld again
Page.6