15
English
3E4723 Gallagher MBS100 MBS200 MBS400 MBS800 Mul -Power User Manual
IMPORTANT BATTERY INFORMATION
Ba ery Type Use 12V deep cycle lead acid ba eries. Ba eries of the same
type and manufacture can be connected in parallel to increase
capacity.
Ba ery
Replacement
Switch energizer OFF. Disconnect energizer from the ba ery.
Replace with fully charged ba ery for best performance.
Ba ery Charging Ba eries must be in a well ven lated area while charging.
Charge ba eries before storage.
Ba ery Storage Store ba eries in a dry place between 0 deg C and 30 deg C. Do
not leave ba eries below 50% charge (12 V) for a prolonged
period of me.
Disposing
Ba eries
All lead acid ba eries must be disposed of safely according
to local regula ons. Use suitable protec ve clothing and
containers for any leaking ba eries.