EasyManua.ls Logo

Garbin TZ S - Page 7

Default Icon
70 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
TRENCHER TZ S
Use and maintenance instructions – Spare parts Via L.da Vinci,32/B
Rev. 01.2013 - EN (translation of the original instructions)
7
36034 Malo (VI) Italy
T E Z A
7- USE AND OPERATION
page 30
7.1- Positions occupied by authorised operators
page 30
7.2- Command and control levers
page 32
7.3- Checks prior to starting
page 33
7.4- Correct operating posture
page 34
7.5- Switching on the machine
page 34
7.6- Handling the machine
page 35
7.7- Before digging
page 35
7.7- After digging
page 36
7.8- Turning off the machine
page 36
7.9- Cleaning the machine
page 37
7.10- Emergency stopping
page 37
7.11- Starting after an emergency stop
page 37
7.12- Prolonged disuse of the machine
page 37
7.13- Starting the machine after prolonged disuse
page 37
7.14- Wiring diagram
page 38
8- MAINTENANCE
page 39
8.1- Routine maintenance
page 39
8.1.1- Routine maintenance table
page 39
8.1.2- Maintenance sheets and registration forms
page 41
8.2- Extraordinary maintenance
page 67
9- DEMOLITION
page 67
9.1- General precautions
page 67
10- ATTACHMENTS
page 67
10.1- Instructions for lifting the machine
page 67
10.2- Hand signals (Directive 92/58/EEC)
page 68
11- SPARE PARTS
page 70
11.1- General precautions
page 70
11.2- Placing orders - Index of parts tables
page 70

Table of Contents

Related product manuals