EasyManua.ls Logo

GARO LS4 - Page 12

GARO LS4
15 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
11
Setting up the secondary meter and Phase
rotation on the DLM Master
Meter configuration
(Second)
Phase rotation of the
ChargePoint
Model of the external meter.
This meter should be addressed “2” and be connected to
the DLM masters meter bus.
RST (L1/L2/L3, Standard Reference Phasing
The phase rotation from the grid on the posts incoming
terminals.

Related product manuals