5-304 D60 Line Distance Protection System GE Multilin
5.7 CONTROL ELEMENTS 5 SETTINGS
5
• BRK 1 FLSHOVR SPV A to BRK 1 FLSHOVR SPV C: These settings specify FlexLogic operands (per breaker pole)
that supervise the operation of the element per phase. Supervision can be provided by operation of other protection
elements, breaker failure, and close and trip commands. A six-cycle time delay applies after the selected FlexLogic
operand resets.
• BRK FLSHOVR PKP DELAY: This setting specifies the time delay to operate after a pickup condition is detected.