
Do you have a question about the GE GDP665SYNFS and is the answer not in the manual?
| Style | built in |
|---|---|
| Color | stainless steel |
| Load Capacity | 16 place settings; up to 16 place settings |
| Number of Cycles | 5 (heavy wash, normal wash, light wash, 1 hour wash, rinse) |
| Number of Options | 11 |
| Drying Type | heated & vented |
| Noise level | 46 dba |
| Control Type | front controls, 8 touch pads; touchpad |
| Delay Start | yes |
| Spray Arms | 3 wash levels (lower, middle, upper) |
| Dispenser | rinse aid dispenser with indicator and adjustment |
| Water Filter | yes |
| Leak Protection | yes |
| Water Softener | no |
| Food Disposer | yes |
| Sanitize Settings | yes |
| Half Load | yes |
| Wi-Fi | no |
| Smart Home | no |
| Remote Control | no |
| Voltage | 120 volts |
| Current | 15 |
| Depth | 24 inch |
|---|---|
| Height | 34 inch |
| Width | 23 3/4 inch |
Read installation instructions completely and carefully before proceeding.
Observe all warnings and cautions for safe installation and operation.
Prepare the rough cabinet opening, ensuring correct depth, width, and height.
Follow codes, limit drain distance to 12', and ensure proper drain height.
Ensure electrical connection, wire size, and supply meet National Electric Code.
Connect the hot water supply line using 3/8" copper tubing or flexible braided hose.
Locate parts, check door balance for proper operation and tension.
Remove toekick, install elbow, connect drain hose to drain loop.
Position water line/wiring and insert drain hose into cabinet hole.
Slide dishwasher into cabinet, pull utilities, and attach trim pieces.
Install mounting brackets to the tub frame for securing to countertop or cabinets.
Push dishwasher into its final position, ensuring correct alignment and door clearance.
Level the dishwasher left-to-right and front-to-back for proper operation.
Secure dishwasher to countertop/cabinet and connect the hot water supply line.
Connect the drain hose to the air gap, waste tee, or disposer using a clamp.
Connect power supply and perform pre-test checks for proper installation.
Position the sound insulation block under the control box and tuck sides.
Realign the toekick with the bottom edge and secure with attachment screws.
Perform final checks and hand over literature package, instructions, and samples.
Loading...